We’re Getting It Wrong on Site (Miscommunication Between Design and Build)
We’re Getting It Wrong on Site (Miscommunication Between Design and Build) There’s a hard truth in engineering and construction: π The drawings aren’t always wrong. π The coordination is. And that’s where projects start to fall apart. The Real Problem: Design vs Reality Across industrial, mining, and construction projects, the same issue keeps showing up: Design teams are working off outdated drawings Site conditions don’t match what was assumed Fabrication is based on incomplete data Install teams are forced to “make it work” π The result? Rework Delays Budget overruns Shutdown extensions This isn’t a capability issue. It’s an information problem . Why Miscommunication Happens on Site Most projects still rely on: 2D drawings Manual measurements Assumptions about existing plant But real-world environments are: Congested Modified over time Rarely documented accurately Even small errors in measurement or interpretation can lead t...